Council usually will not act if:
Issue
Who to Contact
Blocked, damaged or broken Council infrastructure
Report it to Council via the online form below
Blocked, damaged or broken private infrastructure
Contact a plumber
Burst water main, sewerage issue or water supply issue beyond private property
Contact Sydney Water on 13 20 90 or visit www.sydneywater.com.au
Water coming from a neighbouring property
Speak with your neighbour first. If the issue cannot be resolved, contact LawAccess NSW on 1300 888 529, Monday to Friday, 9am to 5pm, excluding public holidays
Emergencies or flood events
Contact the State Emergency Service on 132 500
For drainage issues on private land please use this online form:
Private Stormwater Investigation
To report drainage issues or flooding on Public Land (Reserves & Nature Strips) use this online form:
Drainage Investigation (Public Land)
Inter-allotment drainage systems are private drainage lines that run through dedicated easements across properties. They are usually installed by the developer when a subdivision is built, so lots that cannot drain to the street can still drain safely.
Localised overland flooding can happen when one or more of these things occur:
You may be responsible if changes on your property make flooding worse for others.
Speak with your neighbour or a consulting engineer for advice on ways to improve drainage on your property.
Table drains are designed to overflow in heavy rainfall. This can create sheet flow across properties.
Council may investigate and consider re-profiling the table drain if the ponding is not caused by driveways, is more than 100mm deep, and remains for at least 48 hours after rainfall.
Council may investigate if the ponding affects the wheel path of vehicles.
Council will not usually investigate if the gutter is blocked by overgrown grass from the nature strip, driveway crossing or layback gradients are incorrect, or the kerb and gutter has settled or moved. If the kerb and gutter has settled or moved, Council may include repairs in the next planned road renewal.
Compensation may only apply if the damage was caused by Council negligence. Visit Council's “Insurance Claims” web page for information about making a claim.