Bridge Project – Memorial Avenue, Kellyville
- Project scheduleCompleted. Bridge opened Friday 29 May 2020.
- Contractor nameTalis Civil Pty Ltd
The new Greenway Bridge over Memorial Ave, Kellyville is now open.

Pedestrian Bridge Project – Memorial Avenue, Kellyville - from Pellizzer Blvd to Thomas Boulton Cct.
Construction of a new pedestrian bridge crossing over Memorial Avenue and Rutherford Avenue from Pellizzer Blvd to Thomas Boulton Circuit Reserve.
This high level bridge crossing provides a safe crossing point for pedestrians and cyclists. The design caters for the future widening of Memorial Avenue.
The bridge forms part of the Greenway link, an off road pedestrian/cyclepath that, once complete, will link Bella Vista to Rouse Hill.
Construction Timeline
- Out of hour delivery of main bridge main span truss to comply with Transport NSW regulation.
- Off site fabrication and painting of main span truss.
- Cycleway construction (northern and southern approach).
- Site assembly and installation of main span truss at Memorial Ave near Pellizzer Boulevard (Feb - March 2020).
- Installation and privacy screens of handrail on approaches (Feb - March 2020).
- Assembly of bridge main span truss (Feb - March 2020).
- Bridge main span truss installation out of hours to comply with Transport NSW directive. This will require a full road closure for both Memorial Ave and Rutherford Ave (March 2020).
- Major milestone achieved - bridge truss section has been lifted into place and concrete deck has been poured (April 2020).
- Landscape planting southern and northern abutment, install privacy screens on approach slabs, complete assembly of bridge truss at Memorial Ave including installation of roof mesh, privacy screen, bridge lighting and painting. Turf north side.